Single Family Home MIAMI SHORES SEC 1 AMD

$ 4,289,000
  • 4 bed
  • 4.5 bath
  • 9,750 ft2 (906 m2)
Interested in this listing?
We will connect you with an agent in a short time
Details
    • Listed on:
      January 18, 2026
    • Days on Market:
      30
    • Maintenance:
      n/a
    • Taxes:
      $ 14,138 per year
    • Year:
      2026
    • Furniture:
      -
    • Floor Description:
      Other
    • Terms Considered:
      Cash, Conventional
    • View from Apartment:
      None
    • Parking:
      -
  • Interior Features:
    • First Floor Entry
    • Other
  • Exterior Features:
    • Open Balcony
  • Legal Description:
    200 east palmetto park condo unit ph -1
Description
Fortress-level luxury new construction in the heart of Miami Shores, delivering April 2026. This architectural estate is built entirely of reinforced concrete, including a commercial-grade concrete roof—engineered as a true concrete bunker and constructed to standards exceeding typical residential builds. The property will be delivered fully finished as designed by the builder, with no buyer customization available.

Offering approximately 4,876 SF, the residence features 4 bedrooms and 4.5 bathrooms, including a full bedroom and bathroom on the ground level. Expansive open living spaces flow to a private resort-style backyard showcasing a 15×30 pool with spa and a fully designed outdoor kitchen, ideal for elevated entertaining. A dramatic oversized second-floor terrace enhances the home’s seamless indoor-outdoor lifestyle.

Developed by a master builder with over 20 years of experience and more than 500 completed buildings, originally trained in Italy, this home reflects superior European craftsmanship, precision, and durability rarely seen in new construction.

Walking distance to downtown Miami Shores with the main entrance on 99th Street, surrounded by high-end new construction. Architectural plans and floor layouts available in attachments. A rare opportunity to own a structurally superior luxury residence built to last, delivered fully completed in April 2026.
Map view